近距离双线盾构隧道施工相互影响的监测与分析 被引量:26

Monitoring on the Construction of Dual Shield Intake Tunnels of Waigaoqiao Power Plant
下载PDF
导出
摘要 上海外高桥电厂是我国目前单机容量最大的火力发电厂 ,两条取水隧道是二期工程的一个重要项目 ,但由于其所处地理位置的影响 ,使得设计上取水隧道之间距离较小 ,施工过程中必须进行同步监测。文中详细介绍了监测方案的实施过程 ,分析了隧道内力、隧道断面收敛变形、接触压力等随工程施工的变化规律 ,保证了取水隧道工程施工的顺利进行。 The Waigaoqiao electric power plant in Shanghai is a large fuel electric plant with the largest at present in China electric generator. There are two intake tunnels in the second phase of construction, due to that these two tunnels have been designed too close, a simultaneous monitoring for both tunnels is necessary. In this paper, the full process of the monitoring is introduced and the monitoring data such as the internal force of the tunnel, convergence of tunnel cross section are analyzed to ensure the safety of the construction.
出处 《地下空间》 CSCD 2003年第3期229-233,共5页 Underground Space
基金 上海市重点学科建设项目资助
关键词 取水隧道 盾构 施工监测 近距离隧道 火力发电厂 收敛变形 接触压力 shield construction monitoring close tunnel
  • 相关文献

同被引文献87

引证文献26

二级引证文献74

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部