沉管隧道整体式最终接头的地基刚度差异问题及处置措施 被引量:3

Solutions and problem of foundation stiffness difference of the integrated type closure joint of immersed tunnel of Hong Kong-Zhuhai-Macao Bridge
下载PDF
导出
摘要 在港珠澳大桥,沉管隧道的最终接头在水下的浮力比相邻管节小很多,所以安装时对地基的初始压力是相邻管节的30倍,不处理就有差异沉降。为制定有效的处理措施,通过现场原位载荷板试验、陆上碎石基床压载试验,以及沉管管节沉降数据分析,证实了沉管基础"瞬时"沉降的规律;并基于此规律制定与实施了预压载、超载与接头底部密闭腔压浆的处理措施。 In the Hong Kong-Zhuhai-Macao Link( HZMB) immersed tunnel construction,the foundation pressure of the closure joint when touching down the ground is 30 times of that of the adjacent tunnel elements,as the buoyancy of closure joint is much less than its neighbors. Thus differential settlement exists. To make an effective counter-measures,the character of the 'instant settlement'of immersed tunnel foundation was proved by in-situ loading plate test,full-size load test on land,and the observation of settlement of the existing tunnel elements;based on the settlement character,the measures of preloading,surcharge and sealed grouting below the connection parts were performed.
作者 林鸣 林巍 姬海 刘亚平 LIN Ming;LIN Wei;JI Hai;LIU Ya-ping(CCCC HZMB Island and Tunnel Project General Management Office,Zhuhai 519015,China;CCCC HZMB Island and Tunnel Project General Office Design Division,Zhuhai 519015,China)
出处 《水道港口》 2018年第S2期80-85,共6页 Journal of Waterway and Harbor
关键词 沉管隧道 沉降 风险 基础 最终接头 港珠澳大桥 immersed tunnel settlement risk foundation closure joint HZMB
  • 相关文献

参考文献6

二级参考文献24

  • 1JTJ298-98.防波堤设计与施工规范[S].[S].,..
  • 2社团法人日本埋立浚渫协会.沈埋卜ニネハ工法チ工法施工事例[R].1998.
  • 3社团法人日本埋立浚渫协会.沈埋卜ニネハ工法チ施工事例[R].2005.
  • 4社团法人日本埋立浚渫堀会.沈埋卜ニネハ工法チ施工事例[R].2009.
  • 5JAN SAVEUR. Hazard Analysis[J]. Tunneling and Underground Space Technology, 1997,12(2) : 135-144.
  • 6OLE DAMGAARD LARSEN. Ship Collision with Bridges the In- teraction between Vessel Traffic and Bridge Structures[M]. Switzer- land: IABSE- AIPC - IVBH, 1993.
  • 7ORESUNDSBRO KONSORTIET. The tunnel[M]. Denmark: The Oresund publication, 2011.
  • 8園田恵一郎沈埋函トンネル技術マニュアル(改訂版)[M].日本:財団法人沿岸開発技術研究センター,2002.
  • 9JOHN G. HOUSLEY. Coastal Engineering Manual[M]. U.S. Army Corps of Engineers, 2002.
  • 10J G BERRY. Guidelines for the Design of Armored Slopes under Open Piled Quay Walls[M]. Belgium: PIANC General Secretariat, 1997.

共引文献88

同被引文献28

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部