瓦村水电站溢洪道体型优化试验研究 被引量:7

Experiment Study of Shape Optimization of Spillway for Wacun Hydropower Station
下载PDF
导出
摘要 针对瓦村水电站溢洪道出口水流挑距过大、水舌空间扩散效果不佳、入水区域集中、泄洪消能效果差及泄槽内水翅现象严重等问题,采用比尺为1∶60的正态物理模型对溢洪道体型进行优化试验研究。结果表明,在闸墩尾部加设尾墩,使泄槽段水流流态有了极大的改善,水流平顺,基本上消除了水翅现象;采用连续燕尾挑坎使溢洪道出口水舌合理归槽,空中扩散效果良好,解决了入水集中的问题,消能效果较好,所提挑坎布置形式可供相关工程参考。 Aiming at the problems,such as too large bucket distance,poor effect of water tongue space diffusion,concentration of water area,poor effect of flood discharge energy dissipation,and serious water wings phenomenon in the spillway outlet flow of Wacun hydropower station,the normal physical model test with the scale of 1∶6 was carried out to optimize the shape of spillway.The results show that adding tail pier can greatly improve the flow regime of discharge section and forms a smooth flow to basically eliminate the phenomenon of water wing;continuous dovetail bucket makes water tongue of spillway outlet return tank reasonably,and the effect of air diffusion is good,which solves the problem of water area concentration;the effect of energy dissipation is better.Therefore,the proposed arrangement of bucket provides reference for the similar projects.
作者 李桢 李红
出处 《水电能源科学》 北大核心 2017年第11期68-72,共5页 Water Resources and Power
关键词 泄洪消能 水翅 连续燕尾挑坎 模型试验 瓦村水电站 flood discharge and energy dissipation water wings continuous dovetail flip bucket model test Wacun hydropower station
  • 相关文献

参考文献5

二级参考文献19

  • 1Bark G. Prediction of propeller cavitation noise from model tests and its comparison with full scale data [J] . J. of Fluids Engineering, 1985, 107(1) :112- 120.
  • 2Leggat L J, Sponagle N C. The study of propeller cavitation noise using cross-correlation methods [ J ] J. of Fluids Engineering, 1985, 107 (1):127- 133.
  • 3Higuchi H. Amdt R E A, Rogers M F. Characteristics of tip vortex cavitation noise [J]. J. of Yluids Engineering, 1989, 111(4): 495 - 501.
  • 4JIN Tailai, PAN Shuibo, QIAN Mingsen, et al. Hydraulic design of gate slots [ A ]. International Symposium on Hydraulic Research in Nature and Laboratory [C]. Proceedings Vol. 1 , Wuhan, China, 1992:181 - 186.
  • 5长江重庆航运工程勘察设计院.长江干线宜宾合江门至泸州纳溪航道建设二期工程可行性研究报告[R].重庆:长江重庆航运工程勘察设计院,2006:14-29.
  • 6重庆交通学院.长江上游铜鼓滩航道整治数值模型研究报告[R].重庆:重庆交通学院,2005:33-37.
  • 7重庆西南水运工程科学研究所.长江干线叙泸段铜鼓滩航道整治定床模型试验研究报告[R].重庆:重庆西南水运工程科学研究所,2006:36-39.
  • 8重庆西南水运工程科学研究所.长江干线叙泸段铜鼓滩航道整治动床模型试验研究报告[R].重庆:重庆西南水运工程科学研究所,2006:18-20.
  • 9重庆交通大学.长江叙渝段典型卵石浅险滩的整治技术研究报告[R].重庆:重庆交通大学,2007.
  • 10长江重庆航运工程勘察设计院.长江干线宜宾合江门至泸州纳溪航道建设二期工程初步设计[R].重庆:长江重庆航运工程勘察设计院,2007:10-49.

共引文献85

同被引文献45

引证文献7

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部