期刊文献+

多车协同进路实时优化控制策略

Real-time Optimal Control Strategy for Multi-vehicle Cooperative Route
下载PDF
导出
摘要 企业内部铁路承载着厂区内部各种物资的运输,但是由于受到各种因素的影响,冶金企业内部铁路运输具有物资种类繁多、时效要求差异大、运输路径不唯一性等特征,甚至常常会因生产的不同需求进行改建或者扩建。针对目前冶金企业内部铁路路网的特征与需求,提出了多车协通进路实时优化控制策略,实现了多车进路的协同实时优化控制,提高了冶金企业内部铁路运输的效率与安全性。 The internal railway of enterprises carries all kinds of materials in the factory area.However,due to the influence of various factors,the internal railway transportation of metallurgical enterprises has many characteristics,such as various kinds of materials,great differences in the requirements of timeliness,non-uniqueness of transportation routes and so on.It is often rebuilt or expanded according to the different needs of production.In view of the characteristics and demands of the special road network in metallurgical enterprises,a real-time optimization control strategy of multi-vehicle cooperative routing is proposed,which realizes the coordinated real-time optimization control of multiple vehicle routes,and improves the efficiency and safety of railway transportation in metallurgical enterprises.
作者 钟妙双 唐世华 唐少律 Zhong Miaoshuang;Tang Shihua;Tang Shaolv(Marketing Management Department,Guangdong Shaogang Songshan Co.,Ltd.,Shaoguan Guangdong 512122)
出处 《山西冶金》 CAS 2019年第4期186-187,190,共3页 Shanxi Metallurgy
关键词 内部铁路 多车协同进路 优化控制策略 internal railway multi-vehicle cooperative route optimization control strategy
  • 相关文献

参考文献3

二级参考文献16

  • 1史峰,谢楚农,于桂芳.铁路车站咽喉区进路排列优化方法[J].铁道学报,2004,26(4):5-9. 被引量:42
  • 2王雅琳,马杰,阳春华,桂卫华.有色冶炼企业专用铁路运输智能调度系统研究[J].计算机工程与应用,2006,42(16):207-211. 被引量:2
  • 3龙建成,高自友,马建军,李克平.铁路车站进路选择优化模型及求解算法的研究[J].铁道学报,2007,29(5):7-14. 被引量:34
  • 4Chen Xiangxian, He Yulin, Huang Hai.A component-based topology model for railway interlocking systems[J].Mathe- matics and Computers in Simulation, 2011, 89(1): 1892-1900.
  • 5Cucala A P,Fernandez A, Sicre C,et al.Fuzzy optimal schedule of high speed train operation to minimize energy consumption with uncertain delays and driver's beha- vioral response[J].Engineering Applications of Artificial Intelligence, 2012,25(8) : 1548-1557.
  • 6Roanes-Lozano E, Hernando A, Alonso J A, et al.A logic approach to decision taking in a railway interlocking system using Maple[J].Mathematics and Computers in Simulation, 2011,82 ( 1 ) : 15-28.
  • 7Vansteenwegen P, van Oudheusden D.Developing railway timetables which guarantee a better service[J].European Journal of Operational Research, 2006,173 ( 1 ) : 337-350.
  • 8腾宇,梁方楚.动态规划原理与应用[M].成都:西南交通大学出版社,2011.
  • 9Ganguly S, Sahoo N C, Das D.Multi-objective planning of electrical distribution systems using dynamic pro- gramming[J].International Journal of Electrical Power & Energy Systems, 2013,46 : 65-78.
  • 10Papadimitriou C H, Steiglitz K.Combinatorial optimiza- tion: algorithms and complexity[M].New Jersey: Prentice Hall PTR, 1982.

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部