斜拉桥施工仿真 被引量:6

Construction Simulation of Cable-Stayed Bridge
原文传递
导出
摘要 斜拉桥的施工是一项极其复杂的力学体系转换过程 ,必须进行施工监控。目前的施工监控是采用平面杆系的有限元法。针对仙桃汉江大桥 ,利用块体等空间单元 ,按照施工的真实步骤 ,逼真地建立了该斜拉桥一系列的空间计算模型。使得设计和监控更加逼近真实状态 。 The construction of cable stayed bridge is a very complex transforming course of structure system, construction control must be done. At present, the method of construction control is finite element analysis based on the plan member. In this paper, based on the Xiantao Hanjiang River Highway Bridge and used the space solid and link elements, a course of space calculating model of this bridge really true to life is set up, according to the real construction step. The design and control much close the real station, and the impetus to the construction of cable stayed bridge are given.
出处 《公路》 北大核心 2003年第8期72-75,共4页 Highway
关键词 斜拉桥 施工监控 施工仿真 力学体系转换 空间计算模型 计算机技术 cable stayed bridge simulation technique space calculating model construction control system transformation
  • 相关文献

同被引文献10

引证文献6

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部