通过实例介绍了强夯点夯与冲击碾压技术在机场工程中的应用,可减少填料破碎和分层铺填费用,并缩短工期。
The composite technologies of local compaction and impact rolling is applied in airport engineering based on some examples.The result shows that the cost of the filler breaking and layered filling is reduced and the construction period is saved.
出处
《施工技术》
CAS
北大核心
2011年第S2期55-57,共3页
Construction Technology
关键词
道路工程
强夯
点夯
冲击碾压
roads dynamic compaction
dynamic compaction
local compaction
impact rolling