江苏华电灌云50×2MW风电工程地处沿海滩涂的盐田和渔塘之间,地面以下有约20m深的流塑状无承载力的淤泥土层,通过采用合理措施,确保了在软土地基条件下风电建设的安全可靠。
The Guanyun 50×2MW wind power project of Jiangsu Huadian locates between salt pans and fish ponds on coastal tidal flats,where exists 20m-deep plastic-flowing sludge layer underground without bearing capacity.The safety and reliability of the project on soft soil foundation is ensured by adopting reasonable treatment methods.
出处
《施工技术》
CAS
北大核心
2011年第S2期61-63,共3页
Construction Technology
关键词
沿海滩涂
软土地基
风电建设
tidal flats
soft soil foundation
wind power project