摘要
介绍了工艺设备基础预制桩基的施工顺序、施工方法、施工措施及施工监测,并且通过实践解决了施工环境复杂、施工工期紧等难题,很好地控制了厂房主体结构及其附属构筑物的沉降与位移,确保了工程的施工质量与工期。
This paper introduces construction sequence,construction method,construction measure and construction monitoring of precast pile foundation for process equipment foundation,some difficult problems are solved,including complex construction environment,tight schedule and so on,which controls the settlement and displacement of main structure and auxiliary structures for the workshop,ensures construction quality and construction period.
出处
《施工技术》
CAS
北大核心
2014年第S1期26-28,共3页
Construction Technology
关键词
工艺设备基础
预制桩基
施工技术
监测
process equipment foundation
precast pile foundation
construction
monitoring