以武汉至黄石城际铁路施工为例,介绍隧道预留接触网槽道缺陷整改措施,即采用后置槽道施工的各项关键技术。
Taking Wuhan to Huangshi inter city railway construction as an example,this paper introduces the tunnel reservation contact network channel defects rectification measures and,the key technologies of post channel construction.