高层建筑电气安装施工中,通过对原设计系统图的充分理解,结合施工现场情况,提出切实可行母线槽施工方案,对母线槽插接箱内控制回路进行设计并优化。
In tall building electrical installation construction,through to the full understanding of the original design system combined with the construction site conditions,the feasible bus duct construction plan was put forward,and bus duct plug control circuit design and optimization in the box.
出处
《施工技术》
CAS
北大核心
2014年第S1期567-569,共3页
Construction Technology
关键词
高层建筑
电气
施工方案
设计
优化
tall buildings
electric
the construction plan
design
optimization