摘要
根据泰钢不锈钢炉卷轧机平面布置及周边情况,介绍了新增3台精轧机推移安装采取的技术措施,就相关技术措施设计与校核进行论述。
On the basis of Taigang stainless steel steckel mill layout and the surrounding circumstances,3 finishing mills were added for integral pushing and installation. This paper introduced the technical measures and discussed design and verification of related technology.
出处
《施工技术》
CAS
北大核心
2014年第S2期602-606,共5页
Construction Technology
关键词
精轧机
整体推移
技术措施
设计
校核
finishing rolling mill
integral pushing
technical measures
design
verification