摘要
两河口水电站庆大河沟水处理工程挡水坝为土工膜心墙堆石坝,最大坝高70m,大坝坝体采用土工膜进行封闭防渗,土工膜最大埋深达54m,主要介绍了土工膜施工工艺及主要质量控制措施。
Retaining dam in water treatment engineering in Lianghekou hydroelectric station is rockfill dam with composite geomembrane core wall,the maximum dam height is 70 meters. The geomembrane is used to seepage,the maximum buried height is 54 meters. The authors mainly introduce construction technique and key quality control measures of geomemrane
出处
《施工技术》
CAS
北大核心
2014年第S2期645-647,共3页
Construction Technology
关键词
水电站
土工膜
施工
质量控制
hydroelectric stations
geomembrane
construction
quality control