摘要
结合阳光高尔夫公馆工程施工实际,采用钢板加钢管肋组合整体箱技术,较好地解决了局部超深基坑降水不到位的难题。本技术加快了施工工期,降低了降水成本。
Combined with the Sunshine Golf mansion project,steel plate and steel tube rib combination box technology was used,which solved the problem of local super deep foundation excavation dewatering. This technology speeds up the construction and reduces the cost of dewatering.
出处
《施工技术》
CAS
北大核心
2015年第S1期83-84,共2页
Construction Technology
关键词
深基坑
整体式钢沉箱
降水
施工技术
deep foundation excavation
integral steel caisson
dewatering
construction