摘要
京沪高铁德州东站路基在地基处理时,桩顶由桩网结构调整为桩板结构,对工期提前和沉降总体控制起到了良好作用。详细介绍了碎石垫层+板筏施工工艺。
Based on foundation treatment for subgrade of Dezhou East Station of Beijing-Shanghai highspeed railway,pile-plank structure is used instead of column-net structure at pile top,which takes effect for shortening the construction period and overall settlement control. This paper introduces the construction technology of gravel cushion + raft structure for subgrade of high-speed railway.
出处
《施工技术》
CAS
北大核心
2015年第S1期397-399,共3页
Construction Technology
关键词
铁路工程
高速铁路
路基
碎石垫层
板筏
施工技术
railway engineering
high-speed railway
subgrade
gravel cushion
raft structure
construction