北京和成畅园工程18号楼基础与地库基础底板为整体,基础以后浇带为分界,必须整体浇筑,且基础标高落差较大,浇筑量大,因此施工要求高,难度大。重点介绍了模板施工、混凝土浇筑等施工工艺。
The No. 18 building foundation and garage foundation are as the whole structure in a project of Beijing. The foundation is divided with post-poured strip,so the concrete should be poured integrally. It is difficult for construction because of the large foundation elevation drop and large pouring. The construction technologies of formwork construction and concrete pouring are introduced in detail.