高压线走廊穿越整体地下室商住地块,迫使小区分两期开发。在各方质疑中组织了多专业逆工序施工,超预期达到交房目标。
The construction project had to be developed as two phases because of a high voltage electricity corridor crossing through the plot with an integral basement. The author still arranged reverse construction processes for the relevant engineering despite doubts of lots,and fulfilled delivery of the residences ahead of time unexpectedly.