期刊文献+

某翻建工程对邻近地铁安全的影响分析研究

The Research on Effect of a Rebuilding Project on Safety of Adjacent Subway
下载PDF
导出
摘要 随着城市轨道交通的快速发展,越来越多的地铁线路贯穿于城市中心区,地铁隧道在使用阶段与城市其他建筑物之间相互影响也越来越多。利用ANSYS数值分析软件,在2种工况下,分别分析了地铁4号线区间隧道及联络通道变形与应力变化,得出在整个翻建工程施工过程中,地铁结构最大竖向变形为1.16mm,最大应力为0.81MPa,对地铁4号线的结构安全和正常运营不会造成危害性影响。 With the rapid development of urban rail transit,more and more metro lines throughout the city. Subway tunnel in use phase and mutual influence between city other buildings are more and more. In this paper,by using ANSYS numerical analysis software,under two conditions,respectively analyzes the subway line 4 tunnel deformation and stress changes and contact channel. It is concluded that in the whole expansion project construction process,the subway structure maximum vertical deformation is 1. 16 mm,maximum stress is 0. 81 MPa. The project does not cause harmful effects on subway line 4 structure safety and normal operation.
出处 《施工技术》 CAS 北大核心 2015年第S2期83-85,共3页 Construction Technology
关键词 地铁 翻建工程 数值模拟 影响分析 subways rebuilding project simulation impact analysis
  • 相关文献

参考文献2

二级参考文献13

共引文献97

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部