摘要
在锅炉大板梁吊装过程中通过塔式起重机或汽车式起重机与自制桅杆配合,克服了吊装机具或现场场地的限制,顺利实现了大板梁的吊装就位。
Through the composition of tower crane and Lorry-counted crane and mast in boiler girder hoisting,the limit of hoisting machine and site was overcome,the hoisting and location for girder was successfully completed.
出处
《施工技术》
CAS
北大核心
2015年第S2期775-777,共3页
Construction Technology