期刊文献+

BIM技术在机场贴临扩建工程交通导改中的应用 被引量:11

The Application of BIM Technology in Traffic Guide Reform of Airport Approaching-type Extension Project
下载PDF
导出
摘要 哈尔滨太平机场扩建工程采用贴临式扩建方式,新老航站楼、新老停车场、新老道路和新老高架桥在扩建与运营过程中均存在时间和空间的交叉。项目采用BIM技术,对贴临建设工况进行模拟,对扩建阶段进行部署,对扩建过程中的交通流线进行规划,完美解决了哈尔滨机场贴临式扩建不停航难题。 The expansion project of Harbin Taiping Airport has adopted approaching-type widening modes. In the widening and operate process of new and old terminal buildings,parking lots,roads and viaducts all exists cross-cutting in time and space. The project adopted BIM technology to simulate approaching construction working conditions,deploy expansion stage and plan the traffic flow in extending process which perfectly solved the difficult problem of Harbin airport approaching-type extension non-stop flight.
出处 《施工技术》 CAS 北大核心 2016年第S2期575-579,共5页 Construction Technology
关键词 机场 BIM技术 交通导改 不停航 airports BIM technology traffic guide reform non-stop flight
  • 相关文献

参考文献5

二级参考文献24

  • 1潘溪平.民航机场飞行区扩建工程不停航施工项目管理[J].管理工程学报,2005,19(B10):138-143. 被引量:23
  • 2国家标准道路交通标志和标线[S].2009.
  • 3Chuck Eastman, Paul Teicholz, Rafael Sacks (Eds.).BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors [M], NewYork:John Wiley and Sons, 2008:233-244.
  • 4张建平,张洋,张新.基于IFC的BIM及其数据集成平台研究[C]//第十四届全国工程设计计算机应用学术会议论文集,2008:227~232.
  • 5中华人民共和国住房和城乡建设部.2011-2015年建筑业信息化发展纲要[OL]. 2011. http://www. gov. cn/gongbao/content/2011/content一2010588. htm.
  • 6Kevin Y,Thomas F,Francois G. A development framework for datamodels for computer-integrated facilities management [ J ]. Automa-tion in Construction,2000,2(9) : 145 - 167.
  • 7Tauscher E,Mikulakova E, Konig,M,et al. Automated generation ofconstruction schedules based on the IFC object model [ A ]. ASCEInternational Workshop on Computing in Civil Engineering [ C ],2009 :666 -674.
  • 8Halfawy M M R, Froese T M. Component-based framework for im-plementing integrated architectural/engineering/construction projectsystems [ J]. Journal of Computing in Civil Engineering, 2007 , 21(6):441 -452.
  • 9Sandhu R, Brodt T, Pallot M. Role Based Access Control Models[J]. IEEE Computer, 1996,29(2) :38 -47.
  • 10王广斌,张洋,杨学英,张文娟.工程项目建设信息化发展方向--虚拟设计与施工[J].武汉大学学报(工学版),2008,41(2):90-93. 被引量:32

共引文献166

同被引文献39

引证文献11

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部