无覆盖层河床水下钻孔灌注桩施工技术 被引量:1

Construction Technology of Underwater Bored Pile in No-covered River Bed
下载PDF
导出
摘要 以衡阳东洲湘江大桥水中墩桩基工程为依托,根据无覆盖层河床深水桩基工程的环境特点、工期要求和常规桩基施工技术要求,为解决无覆盖层河床桩基施工易出现的钢护筒无法打入、桩位偏移、冲孔过程中孔内涌沙或漏浆等问题,采取先桩后堰的施工顺序,提出了此类桩基的关键施工控制技术,并成功应用。 Based on the water pier's pile foundation works of the Hengyang Dongzhou Xiangjiang Bridge,according to the environmental characteristics,duration require-ments and conventional pile foundation construction technical requirements of the deep-water pile foundation in no-covered river bed,in order to solve the problem that the steel sheath of the river bed without cover is easy to penetrate,the pile position deviation,the sand in the hole or leakage of mud in the process of punching and other issues,take the construction of the first pile after the cofferdam,the key construction control technology of such pile foundation is put forward and successfully applied.
出处 《施工技术》 CAS 北大核心 2017年第S1期33-35,共3页 Construction Technology
基金 中建一局集团科技研发课题:城市深水宽幅矮塔斜拉桥关键技术研究(KJYF-2015-2)
关键词 无覆盖层河床 水中墩 钻孔灌注桩 双钢护筒 no-covered river bed water pier drilling piles double steel casing
  • 相关文献

参考文献4

二级参考文献12

共引文献99

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部