摘要
本文以小干二桥工程为例,介绍了钢板桩围堰施工及其注意事项,根据钢板桩围堰的施工技术要点,对围堰的强度、稳定性进行了简单的验算。
For Xiaogan Second Bridge as an example,the authors introduce steel plate pile cofferdam construction and attention items. Based on construction characteristics of steel plate pile cofferdam,strength and stability of cofferdam are calculated simply.