摘要
某大型体育场工程地下室深基坑内的抗浮锚杆施工监理工作,是在工期紧,地质条件复杂,多种施工作业交叉进行的情况下,监理方要协调30万m3的土石方开挖、外运,近1.5万m^2地下室基坑边坡围护,158根大直径人工挖孔桩施工,及3908根抗浮锚杆同步施工的监理任务。监理方克服重重困难,采取各项有效措施,督促和帮助施工方在保证施工安全和质量的前提下,终于实现了建设任务目标。
Under tight schedule,complex geological conditions,a variety of construction jobs intersect,anti-floating anchor supervision of the construction works in the basement of a large stadium within the Deep Foundation. Supervisor to coordinate the 300,000 cubic meters of earth excavation and sinotrans,nearly 15,000 square meters in the basement pit slope envelope,158 large-diameter artificial digging pile construction,and the 3908 anti-floating anchor simultaneous construction. In ensuring the safety and quality of construction,the supervisor to take all effective measures to overcome the difficulties,to help and supervise construction unit achieved goals of construction.
出处
《施工技术》
CAS
北大核心
2017年第S1期180-183,共4页
Construction Technology
关键词
抗浮锚杆
监理
深基坑
交叉作业
anti-floating anchor
supervision
deep foundation excavation
cross operations