期刊文献+

高压注浆预应力锚杆复合土钉墙在汇金大厦深基坑应用 被引量:1

Application of the Composite Soil Nailiny Wall and Pre-stressed Anchor with High Pressure Grouting in Huijin Deep foundation Excavation
下载PDF
导出
摘要 论述高压注浆预应力锚杆的作用机理。根据工程边坡的复杂性,提出采用高压注浆预应力锚杆复合土钉墙加固方法。分析了边坡体的参数和加固设计方案,论述锚杆土钉墙及高压注浆的施工工艺。阐述施工中采用的边坡位移检测方案及结果。工程实践表明,高压注浆预应力锚杆复合土钉墙技术可以用于加固复杂边坡,并取得满意的加固效果。 The mechanism of composite soil nailing wall and pre-stressed anchor with high pressure grouting was proposed,which was used in the engineering complicated slope. The slope parameter and strength plan was analyzed,and the construction technology discussed about composite soil nailing wall and pre-stressed anchor. The detection plan and results of slope displacement were analyzed,which shows successful in strength complicated slope by use of composite soil nailing wall and pre-stressed anchor with high pressure grouting.
作者 周春雷
出处 《施工技术》 CAS 北大核心 2017年第S1期200-202,共3页 Construction Technology
关键词 高压注浆 预应力锚杆 复合土钉墙 high pressure grouting pre-stressed anchor composite soil nail wall
  • 相关文献

参考文献3

二级参考文献17

  • 1张旭辉.土钉与锚杆的关系探讨[J].岩石力学与工程学报,2002,21(11):1744-1746. 被引量:6
  • 2朱亚林,孔宪京,邹德高,贾金青.深基坑预应力锚杆柔性支护的非线性有限元分析[J].岩土力学,2005,26(2):323-327. 被引量:20
  • 3丁振明,秦四清,刘军,夏柏如.土钉支护体系抗拔力机理研究[J].岩土力学,2005,26(11):1799-1802. 被引量:18
  • 4陈叶青.[D].北京:清华大学,2000.
  • 5贾金青 宋二祥.一种基坑侧壁的柔性支护方法[P].中华人民共和国专利(E02D017/04,02130834.9.).20030326..
  • 6贾金青.预应力锚杆柔性支护法研究[R].北京:清华大学,2003..
  • 7曾宪明.土钉支护工法的理论与实践[R].大连:大连理工大学,2001..
  • 8中华人民共和国行业标准编写组.建筑基坑支护技术规程(JGJ120—99)[S].北京:中国建筑工业出版社,1999..
  • 9Clifton B F,Blaine L,Darin S,Quality assurance of soil nail grout for Provo Canyon reconstruction Project[C]//2010 Earth Retention Conference Utah.USA,2010:278-285.
  • 10Thomas C S,Carlton L H.Simplified trial wedge method for soil nailed wall analysis[J].Journal of Geotechnical and Geoenvironmental Engineering,2003:117-124.

共引文献245

同被引文献11

引证文献1

二级引证文献2

相关作者