摘要
某工程中机电暗配管对轻集料混凝土空心砌块墙采用先配管后砌筑的施工工艺,对混凝土蒸汽加压砌块墙采用先砌筑后剔槽配管并抹灰封堵的施工工艺,这样施工对二次结构墙体影响较小,施工中能提高生产效率、节约成本。详细介绍了此工程中运用的机电暗配管施工技术。
Based on electromechanical concealed piping construction of some engineering,this paper introduces piping-masonry construction process for hollow block wall with lightweight aggregate concrete,masonry-piping construction process for hollow block wall with concrete steam pressurized process,the construction method has little effect on the second structure wall,which improves production efficiency and saves cost. The authors introduce electromechanical concealed piping construction technology in the engineering.