摘要 马普托(Maputo)大桥是莫桑比克首都马普托市跨越马普托湾的第一座跨海大桥,大桥北侧(Maputo)侧锚碇为重力式锚碇,锚碇基底基岩为第三纪泥岩(半成岩)。通过现场承载力及摩阻力试验,研究了锚碇基底半成岩的地基承载力及基岩-混凝土胶结面的抗剪强度,试验结果表明,锚碇基底半成岩承载力及摩阻力均满足设计取值要求。 The Maputo Bridge is the first cross-sea bridge across the Maputo Bay in Maputo,Mozambique's capital. The north side anchorage of the bridge is a gravity anchor and the basement bedrock is a Tertiary mudstone( semi-diagenetic).The bearing capacity of foundation and the shearing strength of bedrock-concrete cementation surface are studied by field bearing capacity and friction resistance test. The results show that the bearing capacity and friction resistance of the semidiagenetic rock of the anchor foundation are all satisfied and it can be used as a reference for similar engineering.
出处 《施工技术》 CAS 北大核心 2017年第S1期999-1002,共4页 Construction Technology
关键词 锚碇 半成岩 基岩 摩阻力 地基承载力 原位试验 anchorage semi-diagenetic rock bedrock friction resistance bearing capacity of foundation in-situ test
  • 相关文献

参考文献4

二级参考文献40

共引文献22

同被引文献13

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部