期刊文献+

基于BIM的装配式建筑监理质量安全控制研究 被引量:23

Research on Quality and Safety Control of Fabricated Building Supervision Based on BIM
下载PDF
导出
摘要 装配式建筑通过高度的工业化模块营造方式改变了传统现场人工营造技术的弊病,使建筑产品和本行业向低碳、节能、绿色、高效、稳定的方向发展,但同样在各环节中存在且易发多种质量安全问题。为了有效改善装配式建筑监理质量控制水平,应用建筑信息模型(BIM)技术,依托于实际项目的监理工作,开发了一套基于BIM技术的装配式建筑监理质量安全控制系统,包含数据管理、流程控制、现场质量控制、文档管理等功能模块。研究和实践表明,BIM技术可为装配式建筑监理质量控制提供有效的技术支持。 Through the highly industrialization module construction,the fabricated building has changed the disadvantages of the traditional on-site artificial construction technology,brings the building products and the industry to the low-carbon,energy-saving,green,efficient and stable direction. However,there are also many kinds of quality and safety problems in each link. In order to improve the quality control level of the fabricated building supervision effectively,applying building information modeling technology,based on actual project supervision work,a set of quality and safety control system for fabricated building supervision based on BIM technology has been developed. It includes data management,process control,site quality control,document management and other functional modules. Research and practice shows that BIM technology can provide effective technical support for quality supervision of fabricated building supervision.
作者 于凯
出处 《施工技术》 CAS 北大核心 2017年第S1期1114-1117,共4页 Construction Technology
关键词 BIM 质量控制 装配式建筑 功能模块 二次开发 BIM quality control fabricated building function module the second-hand developments
  • 相关文献

参考文献1

二级参考文献17

  • 1曾旭东,赵昂.基于BIM技术的建筑节能设计应用研究[J].重庆建筑大学学报,2006,28(2):33-35. 被引量:79
  • 2McGraw-Hill Construction. The Business Value of BIM- Getting Building Information Modeling to the Bottom Line [ R ]. New York : McGraw-Hill Construction,2009:6.
  • 3Charles Eastman, David Fisher, Gilles Lafue, et al. An outline of the building descripiton system [ R ]. Pitts- burgh : Carnegie-Mellon University, 1974:4.
  • 4GA Van Nederveen,FP Tolman. Modeling multiple views on buildings[J]. Automation in Construction, 1992, 1 (3) :215 -224.
  • 5Laiserin Jerry. Comparing pommes and naranjas [ EB/ OL ]. http: //www. laiserin, com/features/issuel5/fea- ture01, php,2002 - 12 - 16.
  • 6廖晨雅,谭大璐,李昀轩.基于BIM的建筑运营阶段精益管理[A]//2012中国工程管理论坛论文集[C].合肥:中国工程院工程管理学部,2012:92-94.
  • 7C Koch. Operations management on the construction site-developing a human resource and knowledge orien- ted alternative to lean construction [ C ] //20th Annual ARCOM Conference. Edinburgh Campus: Heriot Watt University, 2004 (2) : 1017 - 1027.
  • 8Vladimir Popova, Virgaudas Juoceviciusa, Darius Migil- inskasa,et al. The use of a virtual building design and construction model for developing an effective project concept in 5D environment[ J]. Automation in Construc- tion, 2010,19(3) :357 -367.
  • 9王辉龙.工业地产项目的运营管理[J].经营与管理,2009(4):17-19. 被引量:4
  • 10李鹏,李萌.公租房运营管理主体公司化的思考[J].中国房地产,2011(1):29-31. 被引量:3

共引文献64

同被引文献125

引证文献23

二级引证文献91

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部