摘要
在跨江跨海的特大桥建设中,水中墩大体积承台施工是一种常见的施工形式。大体积承台具有面积大、钢筋密、混凝土用量大、养护难等特点,针对当前桥梁大体积承台施工来说,采取合理施工工艺是确保承台质量关键。以东洲湘江大桥为例,从施工准备、钢筋安装、大体积混凝土配合比、混凝土浇筑及养护措施等方面全面介绍水中墩大体积承台施工技术。
The construction of large-volume under-water piers is a common construction type in the construction of oversize cross-river or cross-sea bridge. Large-volume pile caps are characterized by large area,thick steel bars,high concrete dosage,hard to maintain etc. In view of the current situation of large-volume pile caps' construction,the key to ensure their quality is the reasonable use of construction technology. This paper takes Dongzhou Xiangjiang River Bridge as an example to introduce the construction technology of large-volume pile caps through construction preparation,steel bar installation,the mixing ratio of large-volume concrete,and concrete pouring and curing measures etc.
出处
《施工技术》
CAS
北大核心
2017年第S2期826-830,共5页
Construction Technology
关键词
桥梁工程
大体积承台
混凝土
养护
温控措施
施工技术
bridges
large-volume pile caps
concrete
maintenance
temperature-control measures
construction