现浇箱梁施工沉降控制 被引量:3

Subsidence Control of Cast-in-place Box Beam Construction
下载PDF
导出
摘要 随着工程技术的日益发展,现浇箱梁在桥梁建设中的应用越来越广泛,技术也越来越成熟,但是现浇箱梁施工沉降问题仍是施工中的一项难题。重点分析影响施工沉降的主要因素,并提出相应的解决措施,为同类型现浇箱梁施工沉降控制提供有益借鉴。 With the development of engineering technology,the application of the cast-in-place box girder in bridge construction is more and more used widely,the technology is becoming more and more mature,but the cast-in-place box girder construction settlement problem is still a difficult problem in the construction. The main factors that influence the construction settlement are analyzed,and corresponding solutions are put forward to provide useful reference for the construction settlement control of the same type cast-in-place.
出处 《施工技术》 CAS 北大核心 2017年第S2期873-875,共3页 Construction Technology
关键词 现浇箱梁 施工沉降 加载预压 预拱度 cast-in-place box beam construction settlement load preloading camber
  • 相关文献

参考文献1

二级参考文献1

  • 1JTJ042-2000,公路桥涵施工技术规范[S].

共引文献1

同被引文献16

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部