摘要
钢箱梁与混凝土箱梁的连接是混合梁大桥的关键点,本文以中兴路北延跨秦淮新河主桥钢筋混凝土结合段施工为例,重点论述钢筋混凝土结合段钢箱梁挂篮结合支架施工以及吊装定位及无收缩混凝土浇筑等工艺,全面介绍梁拱组合桥钢筋混凝土结合段施工技术,为类似工程提供借鉴。
Steel box girder and the connection of concrete box girder is key point of composite beam bridge. This paper takes Zhongxing northbound across Qinhuai Xinhe Main Bridge,reinforced concrete construction as an example,discusses concrete combined with period of steel box girder construction technique of combined with stent and hoisting position and no shrinkage concrete pouring process,comprehensive introduction beam arch combination bridge of reinforced concrete construction technology,to provide reference for similar projects.
出处
《施工技术》
CAS
北大核心
2017年第S2期907-909,共3页
Construction Technology
关键词
宽幅预应力
钢筋混凝土混合梁
结合段
挂篮
支架
组合
施工技术
width prestressing
reinforced concrete composite beam
joint section
hanging basket
holder
combination
construction