期刊文献+

浅埋暗挖大断面区间隧道施工地表沉降规律及控制措施研究 被引量:9

Study on Surface Subsidence Law and Control of Underground Excavation of Shallow Large-span Tunnel Construction
下载PDF
导出
摘要 运用数值模拟和现场监测的方法对石家庄地铁1号线留村站~火炬广场站区间浅埋暗挖大断面区间隧道施工引起的地表沉降规律进行了研究,研究结果表明:不同施工阶段地表沉降变形量存在较大的差异,中间导洞开挖对地表沉降的影响较大,约占地表最终沉降量的43%,隧道封闭成环后再拆除支撑能有效减少对地表沉降的影响;对拱顶土体采取深孔注浆、径向注浆等加固措施,可有效增加上部土体强度,减少地层变形。 Based on the method of numerical simulation and field monitoring to study the surface subsidence deformation caused by underground tunnel construction in Shijiazhuang subway line 1,Liucun station-Huoju square station. The results show that,at different stages of construction the surface subsidence is very different,The middle pilot tunnel excavation has great effect on the surface settlement,accounting for about 43% of the final settlement of the surface,the tunnel closure after removing support can effectively reduce the impact of surface subsidence. Deep hole grouting,radial grouting and other reinforcement measures should be taken in the vault to increase the strength of upper soil and reduce formation deformation.
出处 《施工技术》 CAS 北大核心 2017年第S2期1071-1074,共4页 Construction Technology
关键词 隧道 双侧壁导坑法 地表沉降 数值分析 深孔注浆 tunnels double-side-drift method surface subsidence numerical analysis deep hole grouting
  • 相关文献

参考文献5

二级参考文献65

共引文献285

同被引文献65

引证文献9

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部