期刊文献+

核电蒸汽发生器吊装风险分析与控制

Risk Analysis and Control of Lifting of Nuclear Power Steam Generator
下载PDF
导出
摘要 蒸汽发生器是核电站关键设备之一,是承担重要核安全功能的大型容器,具有结构精密、质保等级高、价值高、制造周期长等特点,设备在现场的吊装作业不容有失。蒸汽发生器的结构形式决定了吊装作业只能采用平衡梁兜底吊的方法,吊装难度大,风险高。通过对核电蒸汽发生器的吊装方法进行分析,得出影响吊装风险的倾斜度极限值,提出控制吊装风险的两项措施。实践证明,该措施能有效保证蒸汽发生器吊装的平衡,确保吊装作业的安全。 Steam generator is one of the key equipment of nuclear power station,and is a large container which assumes important nuclear safety function. With precise structure,high quality assurance level,high value and long manufacturing cycle,lifting operation of the steam generator in the site cannot be lost. The structure of the steam generator determines that the lifting operation can only use lifting beam and choose the bottom as lifting points,so the lifting is difficult and the risk is high. In this paper,by analyzing the lifting form of nuclear power steam generator,the tilt limit that affects the risk of lifting is obtained,and two measures to control the risk of lifting are developed. Practice has proved that the measures can effectively ensure the lifting balance of steam generator,to ensure the safety of lifting.
出处 《施工技术》 CAS 北大核心 2017年第S2期1265-1268,共4页 Construction Technology
关键词 蒸汽发生器 吊装 风险 分析 控制 steam generator lifting risk analysis control
  • 相关文献

参考文献8

二级参考文献30

  • 1王宝清.浅析大型设备吊装施工项目管理[J].化学工程与装备,2008(9):161-164. 被引量:12
  • 2左学兵,林金平.浅谈AP1000核岛施工设计变更管理[J].工业建筑,2012,42(S1):802-804. 被引量:7
  • 3郭彦林,崔晓强.大跨度复杂钢结构施工过程中的若干技术问题及探讨[J].工业建筑,2004,34(12):1-5. 被引量:181
  • 4冶金工业部建筑研究总院.GB50205-2001钢结构施工质量验收规范[S].北京:中国计划出版社,2002.
  • 5张玉宝.600MW火电机组工程施工作业指导书[M].北京:中国水利水电出版社,2006.
  • 6成大先.机械设计手册[M].北京:化学工业出版社,2002..
  • 7北京钢铁设计研究总院.GB50017-2003钢结构设计规范[S].北京:中国计划出版社.2003.
  • 8DL/T5210.2-2009,电力建设施工质量验收及评价规程第2部分:锅炉机组[s].
  • 9LD48--93起重机械吊具与索具安全规程[s].1994.
  • 10中国成达工程公司.HG/T21574--2008化工设备吊耳及工程技术要求[S].北京:中国计划出版社,2008.