期刊文献+

地下室后浇带预制超前止水板施工技术 被引量:5

The Construction Technology of Prefabricated Advance Stop Water of Basement Late Poured Bands After Basement
下载PDF
导出
摘要 地下室的外墙后浇带不同于楼板后浇带,对整个地下室的防水及回填施工影响较大。地下室外墙后浇带预制超前止水板技术,采用预制混凝土板提前将后浇带外侧封闭,与传统的外墙后浇带施工工艺相比,能够使基坑提前停止降水,节约长期的降水费用,并且节约资源、减少浪费,具有良好的经济效益和社会效益。文章结合成功实例,阐述地下室外墙后浇带预制超前止水板技术的应用。 The outer wall post-cast strip of the basement is different from the cast-in-place belt,which has great influence on the waterproof and backfill construction of the whole basement. Basement wall after pouring belt precast advanced water technology,using the precast concrete board of the lateral sealing of post-cast strip will be ahead of schedule,compared with the traditional outer wall construction technology of post-cast strip,can make a excavation stop precipitation ahead of time,saving long-term precipitation cost,and saving resources,reducing waste,with good economic and social benefits.Based on the successful examples,this paper expounds the application of precast water board technology in the basement.
出处 《施工技术》 CAS 北大核心 2017年第S2期1461-1463,共3页 Construction Technology
关键词 外墙后浇带 预制板 超前止水 施工技术 outer wall post-cast strip prefabricated slab advanced water stop construction
  • 相关文献

同被引文献31

引证文献5

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部