对一个管桩施工引起周边建筑基础上浮的案例进行分析,找到引起基础结构上浮的原因,提出了托梁置换的处理措施,目前受影响建筑沉降稳定,保证了该建筑的正常使用。
The floating upward of the surrounding building's foundation is analyzed,which caused by the construction of a pipe pile. The reasons for the floating of the foundation are found,and the treatment measures for the replacement of the joist are put forward,and the settlement of the buildings is stable and the normal use of the building is ensured.
出处
《施工技术》
CAS
2018年第S1期246-247,共2页
Construction Technology
关键词
管桩
挤土效应
基础
上浮
pipe piles
squeezing effect
foundations
float upward