长龙山抽水蓄能电站地下厂房安全优质高效施工技术

Research on Safety and High Efficiency Construction Technology of Underground Powerhouse of Changlongshan Pumped-storage Power Station
下载PDF
导出
摘要 长龙山抽水蓄能电站地下厂房洞室群布置紧凑,工期紧。通过采用特大跨度顶拱机械化开挖支护技术,进行关键施工工序优化,采用岩壁吊车梁精细开挖及岩壁吊车梁下拐点精细锁角保护,和个性化施工等技术措施,实现了大型洞室群安全优质高效施工。 Underground powerhouse of changlongshan pumped-storage power station,the arrangement of caverns is compact and the project deadline is tight. Through mechanized excavation support technology of super long span top arch,optimizing key construction procedures,use fine excavation of rock crane girder and fine lock angle protection under rock wall crane's lower turning point,individualized construction technical measures,realize safe,high quality and efficient construction of large caverns.
作者 李学平
出处 《施工技术》 CAS 2018年第S1期904-907,共4页 Construction Technology
关键词 水电站 地下厂房 安全 质量 施工技术 hydropower station underground powerhouse safety quality construction
  • 相关文献

参考文献1

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部