基于模糊理论机场建设工程进度风险管理研究 被引量:3

Study on Progress Risk Management of Airport Construction Project Based on Fuzzy Theory
下载PDF
导出
摘要 结合大型复杂项目的进度风险管理现状,以郑州机场二期工程项目为例,从项目相关的当地政府、业主方、承包方、设计方、监理方、供应方等单位的角度对进度风险因素进行识别。基于问卷调查的基础上,采用模糊理论和风险矩阵对进度风险进行评价,确定风险发生等级,并采取相应的应对措施。 Based on the status of the progress risk management of large and complex projects,the two phase of Zhengzhou airport project is taken as an example to identify the risk factors from the point of view of the relevant local government,the owner,the contractor,the designer,the supervisor,the supplier and other units. Based on the questionnaire survey,the fuzzy theory and the risk matrix are used to evaluate the progress risk,and the risk level is determined and the corresponding measures are taken.
出处 《施工技术》 CAS 2018年第S1期980-983,共4页 Construction Technology
基金 高等学校重点科研项目:基于BIM的大型复杂项目精益建造技术研究(5A560021)
关键词 进度风险 模糊理论 风险评估 研究 progress risk fuzzy theory risk evaluation research
  • 相关文献

参考文献5

二级参考文献59

共引文献130

同被引文献18

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部