裸岩地质双壁钢围堰施工技术 被引量:4

Construction Technology of Double Wall Steel Cofferdam in Bare Rock
下载PDF
导出
摘要 新井冈山大桥的钢围堰在拼装平台上分节拼装,并根据施工水位确定采用2节或3节整体下放。下放时在围堰壁板内对称平稳注水,各钢箱侧面板充当注水隔板,钢围堰制作位于桥位西岸的钢结构加工场,制作完成后采用分节运输至现场安装,分层整体拼装完成后,采用6台200t液压千斤顶整体同步进行下放,钢围堰下放到预定的河床位置后,采用3种方法进行堵漏围堰,并及时清理河床,完成封底混凝土浇筑,最终成功完成封底抽水。 The steel cofferdam of new Jinggangshan bridge shall be assembled in sections on the assembling platform,and2 sections or 3 sections shall be integrally lowered according to the construction water level. During lowering,water is injected symmetrically and stably in the cofferdam wall plate,each steel box side panel serves as a water injection clapboard,the steel cofferdam is manufactured in a steel structure processing field on the west bank of the bridge site,and is transported to the site for installation by sections after the production is completed; after the layered integral assembly is completed,six 200 t hydraulic jacks are adopted for overall synchronous lowering; after the steel cofferdam is lowered to a predetermined riverbed position,three methods are adopted for leakage stoppage cofferdam,and the riverbed is cleaned in time,the back sealing concrete pouring is completed,and the back sealing pumping is finally completed successfully.
作者 黄少兵 张斌
出处 《施工技术》 CAS 2018年第S1期1222-1225,共4页 Construction Technology
关键词 单塔斜拉桥 承台 双壁钢围堰 制作 安装 下放 封底 single tower cable-stayed bridge pile caps double-walled steel cofferdam production installation lower back cover
  • 相关文献

同被引文献29

引证文献4

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部