摘要
北京绿城西山燕庐项目6号楼工期紧,预制构件安装塔式起重机占用率高,独立支撑体系组件少,减少塔式起重机占用率,搭拆简单,施工速度快。
The construction period of the No. 6 building in Beijing Greentown Xishan Yanlu project is serious,occupation rate of tower cranes for prefabricated component installation is high,component of laminated slab independent supporting system is small,which reduces the occupancy rate of tower cranes,dismantling simple,the speed of construction is fast.
出处
《施工技术》
CAS
2018年第S1期1670-1672,共3页
Construction Technology
关键词
叠合板
塔式起重机
独立支撑体系
施工技术
laminated slabs
tower cranes
independent supporting system
construction