贵阳城市轨道交通3号线一期工程盾构工法适应性研究 被引量:2

Study on Adaptability of Shield Construction Method for Guiyang Urban Rail Transit Line No.3 Phase Ⅰ Project
下载PDF
导出
摘要 以贵阳市拟建的轨道交通3号线一期工程为例,对线路沿线地质条件、水文条件,特别是岩溶情况进行前瞻性分析,从工程费用、工期影响、盾构机选取等多种方面进行综合分析,推荐贵阳市城市轨道交通3号线一期工程部分区间工程采用复合式土压平衡盾构机。目前,贵阳轨道交通3号线已拟采用盾构法施工。 Taking the first phase project of Guiyang Urban Rail Transit Line No. 3 as an example,the geological and hydrological conditions along the line,especially the karst conditions,are prospectively analyzed,and the comprehensive analysis is made from the aspects of project cost,time limit and shield machine selection,etc. The first phase project department of Guiyang Urban Rail Transit Line No. 3 is recommended. The composite earth pressure balance shield is used in the inter district project. At present,the Guiyang Urban Rail Transit line No. 3 has been constructed by shield method.
作者 彭放 张蓝兮 PENG Fang;ZHANG Lanxi(Guiyang Urban Rail Transit Co.,Ltd.,Guiyang,Guizhou 550081,China)
出处 《施工技术》 CAS 2018年第A02期82-85,共4页 Construction Technology
关键词 岩溶 岩洞 盾构法 矿山法 karst cave shield method mining method
  • 相关文献

同被引文献19

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部