摘要
阐述一种临海侧素混凝土桩先施工阻水再利用临坑侧高压旋喷桩作为主要止水帷幕的施工方法,解决滨海区域动水条件下高压旋喷桩止水帷幕的施工质量问题。
This paper describes a construction method of waterproof curtain in coastal area:First,constructing coastal Plain concrete piles for cutting off seawater,then,constructing high-pressure jet grouting pile in one side of building foundation pit as the main waterproof curtain.Solving the construction quality problem of waterproof curtain for high-pressure jet grouting pile in Coastal area.
作者
孟庆
MENG Qing(China Construction Second Group the Second Construction Co.,Ltd.,Shenzhen,Guangdong 518005,China)
出处
《施工技术》
CAS
2018年第A04期161-163,共3页
Construction Technology
关键词
滨海区域
素混凝土桩
高压旋喷桩
止水帷幕
施工技术
coastal area
plain concrete pile
high-pressure jet grouting pile
waterproof curtain
construction