单箱多室现浇箱梁模板整体吊装工艺设计与施工 被引量:2

Design and Construction of Formwork Integral Hoisting Technology for Single-box Multi-cell Cast-in-situ Girder
下载PDF
导出
摘要 结合赤石特大桥箱梁结构特点,将1号梁段模板现场散拼工艺优化改进,确定了箱梁标准段模板整体吊装工艺,详细介绍了整体吊装工艺模板设计、加工、安装、拆除以及模板施工中的注意事项。此外,将模板现场散拼工艺和整体吊装工艺在进度、质量、安全等方面进行对比,为同类工程设计与施工提供了参考,同时也体现了模板整体吊装工艺的优越性。 Combining with the box girder structural characteristics of the ChiShi Bridge,the on-site assembly technology of No.1 beam formwork was optimized.The formwork integral hoisting technology of the standard section of the box girder was determined,and the design,processing,installation,dismantling and the notices of the formwork integral hoisting technology are introduced in detail.In addition,the on-site assembly technology and the integral hoisting technology are compared in the progress,quality,safety,etc.It provides reference for the design and construction of similar projects,and also reflects the superiority of the integral hoisting technology.
作者 潘传宗 任雷 PAN Chuanzong;REN Lei(CCCC Second Harbor Engineering Co.,Ltd.,Wuhan,Hubei 430012,China)
出处 《施工技术》 CAS 2018年第A04期426-429,共4页 Construction Technology
关键词 桥梁工程 单箱多室箱梁 现场散拼 整体吊装 模板 设计 施工技术 bridges single-box multi-cell girder on-site assembly technology integral hoisting technology formwork design construction
  • 相关文献

参考文献1

二级参考文献2

同被引文献14

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部