期刊文献+

基于二级起重系统的拱上立柱施工与控制技术研究 被引量:2

Research on Construction and Control Technology of Arch Pillar Based on Secondary Stage Hoisting System
下载PDF
导出
摘要 上承式钢管混凝土拱桥在峡谷地区修建的数量越来越多,拱上立柱的施工方法随地形、运输条件等的差异有所不同。针对桥位条件,提出基于2级起重系统的拱上立柱施工与控制方法,对缆索吊2级起重系统构造与工作原理及拱上立柱施工工艺进行详细阐述,提出拱上立柱安装定位控制技术,包括预抬值的计算与控制等。 The number of deck concrete-filled steel tubular arch bridges have been built in the canyon area.The construction methods for arch pillar vary with the terrain and transportation conditions.For the bridge condition of this bridge,this paper proposes a method of construction and control of the arch pillar based on the secondary stage hoisting system.The construction and working principle of the cable hoisting secondary hoist system and the construction technology of the arch column are elaborated in detail.Finally,the installation and positioning control technology of the upper arch column is proposed,including the calculation and control method of advanced raising value.
作者 郭金亮 韩连涛 曹忠良 余芝蓉 龚娟 钟青 GUO Jinliang;HAN Liantao;CAO Zhongliang;YU Zhirong;GONG Juan;ZHONG Qing(CCCC Third Highway Engineering Co.,Ltd.,Beijing 100107,China;Qinghai Provincial Highway Construction Administration,Xi’ning,Qinghai 810008,China)
出处 《施工技术》 CAS 2018年第A04期634-638,共5页 Construction Technology
基金 青海省重点研发计划(2017-SF-137)
关键词 上承式钢管混凝土拱桥 拱上立柱 缆索吊装系统 预抬值 有限元分析 deck concrete-filled steel tubular arch bridge arch pillar cable hoisting system advanced raising value finite element analysis
  • 相关文献

参考文献1

二级参考文献8

共引文献195

同被引文献18

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部