期刊文献+

南昌朝阳大桥静动载试验研究 被引量:2

Study of Static and Dynamic Load Tests of Chaoyang Bridge in Nanchang
下载PDF
导出
摘要 南昌朝阳大桥为主跨5×150m的六塔七跨波形钢腹板PC箱梁斜拉桥。为判断成桥的实际承载力以及设计使用荷载下的工作性能,对该桥进行静载和动载试验。结合该桥的实际受荷情况确定试验方案,测试各静载工况下主梁应力和挠度、主塔偏位和索力增量,以及动载试验下桥梁结构的自振特性和行车激振特性。将实测静动载试验结果与理论计算结果对比分析,结果表明:该桥结构受力合理,具有足够的强度和刚度,实际承载能力和工作性能满足设计荷载安全运营要求。 Nanchang Chaoyang Bridge mainly across the 5×150 m six tower seven cross-shaped steel web PC box girder cable-stayed bridge.In order to determine the actual carrying capacity of the bridge and the design performance under the load,the bridge is subjected to static load and dynamic load test.According to the actual load condition of the bridge,the test scheme is determined to test the stress and deflection of the main girder under the static load conditions,the increment of the main tower and the increase of the cable force,and the vibration characteristics of the bridge structure under the dynamic load test and the driving excitation characteristic.The results show that the bridge structure is reasonable,with sufficient strength and stiffness,and the actual carrying capacity and working performance meet the requirements of safe operation of the design load.
作者 刘耀东 聂闯 唐齐 LIU Yaodong;NIE Chuang;TANG Qi(School of Civil Engineering&Architecture,Hubei University of Technology,Wuhan,Hubei 430068,China)
出处 《施工技术》 CAS 2018年第A04期639-642,共4页 Construction Technology
基金 湖北省桥梁安全监控技术及装备工程技术研究中心开放基金(QLZX2014008)
关键词 多塔斜拉桥 静载试验 动载试验 multi cable-stayed bridge static load test dynamic load test
  • 相关文献

参考文献5

二级参考文献23

共引文献56

同被引文献13

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部