摘要 肇庆枫湾桥由15.5m简支T梁改建为3跨连续下承式钢结构系杆拱桥,新桥施工时利用旧桥作为临时施工便道,采用1台350t、1台400t汽车式起重机站在旧桥上方吊装构件。以旧桥T梁承载力为控制变量,通过路基箱使2片T梁承受1台汽车式起重机支腿荷载,整个吊装过程平稳,旧桥主梁变形可控,无明显裂缝。 Fengwan bridge is rebuilt from 15.5 m simply supported T beam to three span continuous through steel structure tied arch bridge,and old bridge was used as construction road when new bridge was constructed.the components of the new bridge was lifted by one 350 t and one 400 t truck cranes on the old bridge.Taking the bearing capacity of the old bridge T beam as the control variable,with wo beams bearing the weight of one truck leg by subgrade box,the whole process of lifting was safety and steady,the deformation of the old bridge was controlled and no apparent fracture.It can be an example for the same bridge construction.
作者 郝雪冬 徐超 张开尧 HAO Xuedong;XU Chao;ZHANG Kaiyao(China Construction Steel Structure Corporation,Shenzhen,Guangdong 518040,China)
出处 《施工技术》 CAS 2018年第A04期697-700,共4页 Construction Technology
关键词 既有旧桥 改建 承载力 研究 existing old bridge reconstruction bearing capacity research
  • 相关文献

参考文献3

二级参考文献4

共引文献4

同被引文献7

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部