随着国民经济的飞速发展,人们对建筑物的功能要求越来越高,而功能的增多需要更多的电缆为其提供动力支持,电缆回路越多,施工越困难,如何将敷设电缆变得简单美观是众多施工单位普遍面临的技术难题,尤其在低压配电房等狭小区域,要将几百条甚至上千条大小不一,回路不同的电缆合理的排布在有限空间的电缆沟里面是一件困难的工作。应用BIM技术模拟电缆沟及整个项目的电缆排布,可以有效解决电缆敷设中存在的问题,使得电缆排布合理,施工简单有序。
With the rapid development of national economy,the functional requirements of the building more and more high,and increased functionality need more cable to provide power support,cable loop construction more and more difficult,how will become simple and beautiful laying cable is a technical problem facing many construction units,especially in the low voltage distribution room and other small area that will be hundreds of even thousands of different sizes,different cable loop cable channel arrangement reasonable in the limited space inside,very difficult.The application of BIM technology to simulate the cable trench and the cable arrangement of the whole project can effectively solve the problems existing in the cable laying,so that the cable arrangement is reasonable and the construction is simple and orderly.
作者
方速昌
张世宏
吴键
韩杰
FANG Suchang;ZHANG Shihong;WU Jian;HAN Jie(China Construction Eighth Engineering Division Co.,Ltd.,South China Branch,Guangzhou,Guangdong 510700,China)
出处
《施工技术》
CAS
2018年第A04期986-989,共4页
Construction Technology
关键词
BIM技术
电缆沟
电缆排布
电缆敷设
BIM technology
cable trench
cable arrangement
cable laying