期刊文献+

分片式预制综合管廊环筋扣合连接施工技术 被引量:1

Construction Technology of Annular Closed Reinforcement Connection on Split Type Precast Utility Tunnel
下载PDF
导出
摘要 针对现有综合管廊预制施工过程中存在的问题,提出环筋扣合式分片综合管廊施工技术,并对分片式预制管廊的设计、生产和装配技术进行施工研究,为预制分片管廊装配技术的应用提供数据支撑。 This paper proposes the construction technology of the annular closed reinforcement split type precast utility tunnel in view of the existing problems in the process of precast utility tunnel.And the design,production and precast construction technology of precast utility tunnel were also studied,which provides the data support for the application of the split type precast construction technology.
作者 魏金桥 杨松强 郜玉芬 焦安亮 WEI Jinqiao;YANG Songqiang;GAO Yufen;JIAO Anliang(China Construction Science&Technology He’nan,Co.,Ltd.,Zhengzhou,He’nan 450000,China;China Construction Seventh Engineering Division Co.,Ltd.,Zhengzhou,He’nan 450000,China)
出处 《施工技术》 CAS 2018年第A04期1266-1268,共3页 Construction Technology
关键词 环筋扣合 综合管廊 分片式 施工技术 annular closed reinforcement utility tunnel split type construction
  • 相关文献

参考文献1

二级参考文献1

  • 1JTG D60-2004.公路桥涵设计通用规范[S]..2004

共引文献19

同被引文献6

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部