Construction Technology of Large Section Rectangular Pipe Jacking Under the Channel
下载PDF
导出
摘要 结合苏州市城北路综合管廊工程五标元和塘段顶管工程针对大截面矩形顶管长距离顶进、下穿既有河道、等特殊顶进工况进行探讨,顺利解决了机头背土、顶进阻力大、工作井涌水涌砂、地面沉降过大等问题,并提出对出土方式、减阻技术和土体改良的技术创新。 Combined with the pipe jacking project of the Comprehensive pipe corridor project of Chengbei road in Suzhou city,this paper probes into the special jacking conditions such as the long distance of the rectangular pipe jacking with large section,crossing existing river channels and successfully solves the problems such as the huge jacking resistance,water gushing in the working well and excessive ground subsidence.The technical innovation of excavating method,anti-drag technology and soil improvement were also put forword.
作者 龚颖 孔德凡 GONG Ying;KONG Defan(Shenzhen Municipal Engineering Co.,Shenzhen,Guangdong 518109,China;Hohai University,Nanjing,Jiangsu 210000,China)
出处 《施工技术》 CAS 2018年第A04期1331-1334,共4页 Construction Technology
关键词 大截面矩形顶管 自动润滑注浆 下穿河道 土体改良 large cross-section rectangle pipe jacking automatic lubrication grouting river crossing soil improvement
  • 相关文献

参考文献3

二级参考文献4

共引文献52

同被引文献18

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部