摘要 以台州湾大桥及接线工程刺渡2号隧道为例,介绍CD法施工关键技术,并对隧道周边位移及拱顶沉降变形规律进行分析,通过对监测数据进行拟合,建立指数变形模型。CD法的成功实践为类似大断面双连拱隧道工程提供一定的借鉴作用,指数变形模型可以较好地描述隧道变形规律,模型参数可由Origin软件拟合得到。 By taking Taizhou Bay Bridge and wiring project Situn No.2 tunnel as an example,this paper introduced the CD method construction key technology,and the displacement around the tunnel and the deformation and deformation of the vault were analyzed.Through the monitoring data fitting,it established the index deformation model.The successful practice of CD method provided a reference for similar large-section double-arch tunnel project,and the exponential deformation model can describe the tunnel deformation law well,its model parameters can be fitted by Origin software.
作者 李到洪 王鹏程 翟阳 陈俐光 高志峰 LI Daohong;WANG Pengcheng;ZHAI Yang;CHEN Liguang;GAO Zhifeng(China Construction Municipal Engineering Co.,Ltd.,Beijing 100071,China)
出处 《施工技术》 CAS 2018年第A04期1390-1393,共4页 Construction Technology
关键词 隧道工程 CD法 拱顶沉降 指数变形模型 tunnels CD method vault settlement exponential deformation model
  • 相关文献

参考文献2

二级参考文献10

共引文献165

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部