摘要
医院对首层空间要求越来越大,在此背景下,多层悬挂钢结构连廊应运而生。悬挂钢结构通过现浇主体结构顶部承受钢结构的吊挂竖向荷载,每层走廊自上而下施工,并对走廊测量进行精确控制,达到较高的施工质量。
The requirements for the first floor space in the hospital are becoming more and more large.In this paper,the multi-storey steel structure corridor has emerged as the times require.The suspended steel structure bears the vertical load of the steel structure through the top part of the cast-in-place main structure.Every corridor is constructed from top to bottom,and the precise control of the corridor measurement achieves high construction quality.