紧邻地铁超深基坑嵌岩地下连续墙施工技术 被引量:14

Construction Technology of Rock-socketed Diaphragm Wall in Ultra-deep Foundation Excavation Adjacent to the Subway
下载PDF
导出
摘要 介绍紧邻地铁超深基坑嵌岩地下连续墙关键施工技术,针对施工难题创新采用旋挖机、成槽机、冲孔锤与铣槽机等组合机械成槽施工技术,并结合咬合桩及三重管高压旋喷桩对地下连续墙槽壁进行双重防护,保障地铁隧道安全。利用BIM三维实况模拟技术对地下连续墙施工工况进行模拟分析,并通过全自动化监测系统动态检测基坑及地铁隧道变形,有效保证地铁隧道安全。 This paper introduces the key construction technology of the rock-socketed diaphragm wall near the ultra-deep foundation excavation of the subway.In order to solve the construction problems,the combination of rotary excavation machine,slotting machine,punching hammer and slot milling machine is used to form the groove forming construction technology,and combined with the occlusion.Piles and triple-tube high-pressure jet grouting piles are used to double-guard the diaphragm wall to ensure the safety of the subway tunnel.The BIM three-dimensional real-time simulation technology is used to simulate the construction conditions of the diaphragm wall,and the deformation of the foundation excavation and the subway is dynamically detected by the fully automated monitoring system to effectively ensure the safety of the subway tunnel.
作者 李松晏 梁森 张文 张明 王逸鸣 LI Songyan;LIANG Sen;ZHANG Wen;ZHANG Ming;WANG Yiming(The First Construction Co.,Ltd.of China Fourth Construction Bureau,Guangzhou,Guangdong 510800,China)
出处 《施工技术》 CAS 2019年第9期90-93,共4页 Construction Technology
基金 中建四局课题:复杂条件下超深超高新型逆作法工程关键技术研究与应用 邻近地铁超深基坑工程关键技术研究与应用
关键词 地铁 超深基坑 地下连续墙 建筑信息模型 施工技术 subways deep foundation excavation diaphragm walls building information modeling(BIM) construction