架桥机更换既有铁路桥梁施工技术 被引量:10

Construction Technology of Bridge Machine Replacing Existing Railway Bridges
下载PDF
导出
摘要 以既有线更换桥梁施工为例,详细介绍架桥机更换施工过程,重点从架桥机在既有线上的布置、梁片运输、旧梁拆除、新梁架设及线路恢复等方面进行阐述。通过多次论证及方案优化,对施工全过程进行有效把控,最终安全、顺利地完成了北京市域铁路S5线的旧梁更换任务,成功地解决了架桥机更换旧梁的施工难题。 Taking the replacement of existing railway line bridges as an example,the replacement construction process of the bridge machine is introduced in detail.The layout of the bridge machine,beam transport,old beam removal,new beam erection and line recovery are described.Through a number of demonstrations and program optimization,the entire construction process is effectively controlled,and the old beam replacement task of the Beijing area railway S5 line is finally completed safely and smoothly.It successfully solves the construction problem of replacing the old beam by the bridge machine.
作者 肖冲 XIAO Chong(China Railway Sixth Group Co.,Ltd.,Beijing 100036,China)
出处 《施工技术》 CAS 2019年第9期114-116,共3页 Construction Technology
关键词 铁路 桥梁 既有线 架桥机 换梁 施工技术 railway bridges existing railway line bridge machine replacing beams construction
  • 相关文献

参考文献5

二级参考文献17

共引文献29

同被引文献57

引证文献10

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部